top of page
Search
Writer's pictureDrew Ratterman

New Master Bathroom!

It has been a busy year here at DSR Builders and we wanted to catch everyone up on the bathroom remodel that we finished earlier this year. We set the shower pan in the shower and then prepped the wall for tile.



A final step that was done was waterproofing the entire pan and wall assembly to ensure that no water escapes. The new drain was then set and installed.




The owner made great tile selections and requested a ninety degree herringbone pattern on the walls. and vertical portions of the shower seat. A frameless shower enclosure was then installed along with a new toilet for the homeowner. After all of this was completed new paint and hardware was installed for a brand new master bathroom. See the before and after below!




19 views0 comments

Recent Posts

See All

Comments


Post: Blog2_Post
bottom of page